Case Studies

Page 3 of 41234
news
540x222 SHB

Sydney Harbour Bridge

The Sydney Harbour Bridge, or ‘The Coathanger’ as it is affectionately known, is a steel arch bridge across Sydney Harbour that carries a variety of traffic between the Sydney central business district and the North Shore. The bridge is an iconic part of the Sydney landscape and provides an impressive view of the nearby Opera […]

news
540x222 16Floor

In-building design and installation

The office development was one of two 16 floor towers linked via the below ground basement. With a potential capacity of approximately 2,500 personnel at any one time, the need for dedicated capacity and coverage was paramount to the business and could not be guaranteed via the existing macro layer by the operator. On initial […]

news
540x222 O2 Dublin

O2 Dublin

The venue was at a late stage of re-development at the time of instruction and a full RF survey could not be undertaken due to the level of completeness and ongoing building works. On this premise we utilised the Motorola Enterprise Planning tool which allows AutoCAD floor plans of the venue to be loaded in […]

news
011

Maintenance and fault resolution

Cellular Asset Management had been providing both proactive maintenance and reactive fault resolution services for one of the United Kingdom’s mobile operators for a number of years. The introduction of a second operator’s portfolio increased the number of sites to 1,000+ spread across the United Kingdom. This increase required us to re-visit existing processes to […]

Page 3 of 41234